The loom is all done just started wraping it all back together, iv managed to lose 5kg out of the loom.
iv lost all luxuries.
Air Bag
ABS
radio
heater/A.C
elc mirrors
windows
heated rear screen
central locking
also things like parking brake applied warning, brake fuild low warning, elc headlamp aim intera light.
I should have Lights and engine mangement (if iv done it right)
ordered a few bits from rcm,lateral loads of gaskets,top an bottom hoses, oil feed restrictor for the turbo,fuelab billet fuel filter ,also ordered my 1st bit of cosworth. a Cosworth Billet Timing Belt Guide.
still waiting on suspension bush kit, anti lift kit, subframe locking bolts.
I am on the hunt for some alloy lower arm (cheep) if anyone know of some,
HOPFULLY the underside of the shell being Painted on friday
still white!?! maybe lol