A very messy engine bay removing old gauges. also removed air con as well.
i have fabricated my knock link in my air duct.
wires and bits every where at the moment.
avcr in wired in to the ecu wireing.
cleaned engine ready for build.
bottom
i have been speaking to mark @ lateral performance about my spec, possibly might get the 2.5 relinered to make it even stronger so i can see over the 500 mark in the future.
waiting for prices...