Started at silly oclock as bit of a trek.
Got up there and grabbed a bit of brekie
a few of the inside.
The wall painting was cool, and the radiators
upstairs office areas
smart graphics on all the doors
Making a start on replacing lateral link arms. Which actually took over 3 hours. Everything seized.
Shame ARB is so rusty.
Had ds2500 pads and fluid replaced, then onto the ramp for alignment.
Left home at 5am and got back again at 9.30pm and a lot lighter in the cash department