Then set about the exhaust. All new 3" system fully Vbanded. Aim here was as straight and possible. The mid pipe:
Rear muffler
ENGINE STUFF!!!!
Heads skimmed and rebuild
EJ257 crank and rods clearenced :
Then checked the deck height etc with the pistons before final assembly and cracked on getting the heart of the build built!
Cosworth cam belt
ready to go in..... almost